![]() Blocked creek entrance near proposed terminal site. |
||||
|
Bonny River Terminal
|
||||
|
Mobil Producing Nigeria Unlimited has planned an NGL export terminal on the left bank of Bonny River.
The project included among others the reclamation of tidal swamps, re-routing of creeks, an NGL export jetty and a small boat dock, all in/along the dynamic bank of Bonny River (tides, waves).
The following services were provided: |
Client Mobil Producing Nigeria Unlimited, Lagos, Nigeria
Location
Date
Services |
|||
|
Svašek Hydraulics Schiehaven 13G, P.O. Box 91, 3000AB Rotterdam, The Netherlands Phone +31 10 467 13 61. Fax +31 10 467 45 59 Internet: www.svasek.com. E-mail: info@svasek.com |
![]() |
|||