![]() |
||||
|
OSO NGL Recovery Project Bonny River Terminal
|
||||
|
The recovery of NGL from the OSO oil and gas fields in Nigeria requires among others the construction
of an export terminal in Bonny River between Bonny Town and the ocean corner. The terminal includes
the construction of a loading jetty for large NGL carriers and a small boat dock inside Finima Creek
with access to the river. The marine facilities were designed in 1995 and completed in 1997.
The following services were provided: |
Client Mobil Producing Nigeria Unlimited (owner) Bouygues Offshore (EPC contractor)
Location
Date
Services |
|||
|
Svašek Hydraulics Schiehaven 13G, P.O. Box 91, 3000AB Rotterdam, The Netherlands Phone +31 10 467 13 61. Fax +31 10 467 45 59 Internet: www.svasek.com. E-mail: info@svasek.com |
![]() |
|||