Download project sheet in PDF format


Manoel Island/Tigne Point Development Project

To maintain a satisfactory water quality level, after a marina development in Lazaretto Creek/Manoel Island, the circulation of the water may have to be improved by widening the channel at Gzira Bridge.

To evaluate the present current patterns, CTD observations are carried out at various locations in Marsamxett Bay. Also currents under the Gzira Bridge and simultaneous water level measurements on various locations in the creeks have been carried out.

Client
Midi Plc, Malta

Location
Sliema, Malta

Date
2001

Services
Deployment of VALEPORT 108 MKIII CTD instrument, water level measurements with an ORPHEUS pressure probe, data processing of monitoring data and analyses of the monitoring results

Svašek Hydraulics
Schiehaven 13G, P.O. Box 91, 3000AB Rotterdam, The Netherlands
Phone +31 10 467 13 61. Fax +31 10 467 45 59
Internet: www.svasek.com. E-mail: info@svasek.com